Each of the five exam objectives will require
operation of the simulator starting at a power level corresponding to
the same Initialization Conditions (IC's) accessed in starting up the
plant. The objectives are sequenced in an order corresponding to a
normal plant startup. Bonus points are awarded if the objective is
completed within a given time.OBJECTIVE 1 (Source Range Operation) - A. Bring the
reactor critical and establish a positive reactor period; B. Allow
power to increase to IRM range 3 or above, then terminate the
objective by exiting the simulation.
OBJECTIVE 2 (Intermediate Range Operation) - A.
Raise power and commence a normal reactor heatup. do not exceed an
average heatup rate of 500 degrees per hour; B. When reactor
temperature has increased to 225 degrees or above, terminate the
objective by exiting the simulation.
OBJECTIVE 3 (Turbine Generator Operation) -
A. Raise power until the bypass valve is between 30 and 40 percent
open; B. Roll the turbine generator to 900 rpm at the slow rate, then
soak for greater than 2 minutes. Increase to rated speed at the fast
rate;
C. Synchronize and load the generator. When load has been increased to
150 MWe or above, terminate the objective by exiting the simulation.
OBJECTIVE 4 (Manual Load Following) - A. Withdraw
control rods to the 50 percent rod pattern, then raise core flow to
100 percent; B. When reactor power is between 48 percent and 52
percent, and core flow is at 100 percent, terminate the objective by
exiting the simulation.
OBJECTIVE 5 (100% Power Operation) - A. Raise core
flow to 50 percent then withdraw control rods to the 100 percent rod
pattern; B. Raise core flow to 100 percent; C. When both reactor power
and core flow are at 100 percent, terminate the objective by exiting
the simulation.